![]() | ![]() |
| 2009 | ||
|---|---|---|
| 2 | Daniel Baraz, Gur Mosheiov: Erratum to "A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time" [European Journal of Operational Research, 184 (2) (2008), 810-813]. European Journal of Operational Research 197(2): 844 (2009) | |
| 2008 | ||
| 1 | Daniel Baraz, Gur Mosheiov: A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time. European Journal of Operational Research 184(2): 810-813 (2008) | |
| 1 | Gur Mosheiov | [1] [2] |
Data released under the ODC-BY 1.0 license — See also our legal information page