![]() | ![]() |
| 2010 | ||
|---|---|---|
| 3 | M. Rajkumar, P. Asokan, T. Page, S. Arunachalam: A GRASP algorithm for the Integration of Process Planning and Scheduling in a flexible job-shop. IJMR 5(2): 230-251 (2010) | |
| 2008 | ||
| 2 | P. Asokan, J. Jerald, S. Arunachalam, T. Page: Application of Adaptive Genetic Algorithm and Particle Swarm Optimisation in scheduling of jobs and AS/RS in FMS. IJMR 3(4): 393-405 (2008) | |
| 2007 | ||
| 1 | B. Shahul Hamid Khan, G. Prabhaharan, P. Asokan: A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness Int. J. Comput. Math. 84(12): 1731-1741 (2007) | |
| 1 | S. Arunachalam | [2] [3] |
| 2 | J. Jerald | [2] |
| 3 | B. Shahul Hamid Khan | [1] |
| 4 | T. Page | [2] [3] |
| 5 | G. Prabhaharan | [1] |
| 6 | M. Rajkumar | [3] |
Colors in the list of coauthors
Last update Sat May 26 04:23:17 2012 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page