| 2011 | ||
|---|---|---|
| 32 | Roel Leus, Christian Artigues, Fabrice Talla Nobibon: Robust optimization for resource-constrained project scheduling with uncertain activity durations. IEEM 2011: 101-105 | |
| 31 | Alain Haït, Christian Artigues: On electrical load tracking scheduling for a steel plant. Computers & Chemical Engineering 35(12): 3044-3047 (2011) | |
| 30 | Laurent Houssin, Christian Artigues, Erwan Corbel: Frequency allocation problem in a SDMA satellite communication system. Computers & Industrial Engineering 61(2): 346-351 (2011) | |
| 29 | Oumar Koné, Christian Artigues, Pierre Lopez, Marcel Mongeau: Event-based MILP models for resource-constrained project scheduling problems. Computers & OR 38(1): 3-13 (2011) | |
| 28 | Thierry Garaix, Christian Artigues, Dominique Feillet, Didier Josselin: Optimization of occupancy rate in dial-a-ride problems via linear fractional column generation. Computers & OR 38(10): 1435-1442 (2011) | |
| 27 | Christian Artigues, Marie-José Huguet, Pierre Lopez: Generalized disjunctive constraint propagation for solving the job shop problem with time lags. Eng. Appl. of AI 24(2): 220-231 (2011) | |
| 2010 | ||
| 26 | Sébastien Lannez, Christian Artigues, Jean Damay, Michel Gendreau: Column Generation Heuristic for a Rich Arc Routing Problem. ATMOS 2010: 130-141 | |
| 25 | Boris Bontoux, Christian Artigues, Dominique Feillet: A Memetic Algorithm with a large neighborhood crossover operator for the Generalized Traveling Salesman Problem. Computers & OR 37(11): 1844-1852 (2010) | |
| 24 | Bernat Gacias, Christian Artigues, Pierre Lopez: Parallel machine scheduling with precedence constraints and setup times. Computers & OR 37(12): 2141-2151 (2010) | |
| 23 | Mohamed Ali Aloulou, Christian Artigues: Flexible solutions in disjunctive scheduling: General formulation and study of the flow-shop case. Computers & OR 37(5): 890-898 (2010) | |
| 22 | Christian Artigues, Nicolas Jozefowiez, Mohamed Ali Aloulou: An exact method for the bi-objective one-machine problem with maximum lateness and unit family setup cost objectives. Electronic Notes in Discrete Mathematics 36: 1233-1240 (2010) | |
| 21 | Maria Ayala, Christian Artigues, Bernat Gacias: Lagrangian relaxation-based lower bound for resource-constrained modulo scheduling. Electronic Notes in Discrete Mathematics 36: 191-198 (2010) | |
| 20 | Thierry Garaix, Christian Artigues, Dominique Feillet, Didier Josselin: Vehicle routing problems with alternative paths: An application to on-demand transportation. European Journal of Operational Research 204(1): 62-75 (2010) | |
| 19 | Rafael Elizondo, Víctor Parada, Lorena Pradenas, Christian Artigues: An evolutionary and constructive approach to a crew scheduling problem in underground passenger transport. J. Heuristics 16(4): 575-591 (2010) | |
| 2009 | ||
| 18 | Bernat Gacias, Christian Artigues, Pierre Lopez: Parallel machine scheduling with precedence constraints and setup times CoRR abs/0902.3121: (2009) | |
| 17 | Christian Artigues, Michel Gendreau, Louis-Martin Rousseau, Adrien Vergnaud: Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound. Computers & OR 36(8): 2330-2340 (2009) | |
| 16 | Audrey Dupont, Andréa Carneiro Linhares, Christian Artigues, Dominique Feillet, Philippe Michelon, Michel Vasquez: The dynamic frequency assignment problem. European Journal of Operational Research 195(1): 75-88 (2009) | |
| 15 | Christian Artigues, Cyril Briand: The resource-constrained activity insertion problem with minimum and maximum time lags. J. Scheduling 12(5): 447-460 (2009) | |
| 14 | Christian Artigues, Van-Dat Cung, Gerd Finke, Bernard Penz: Articles ROADEF 2007. RAIRO - Operations Research 43(4): 373-374 (2009) | |
| 2008 | ||
| 13 | Christian Artigues, Dominique Feillet: A branch and bound method for the job-shop problem with sequence-dependent setup times. Annals OR 159(1): 135-159 (2008) | |
| 12 | Christine Solnon, Van-Dat Cung, Alain Nguyen, Christian Artigues: The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem. European Journal of Operational Research 191(3): 912-927 (2008) | |
| 2007 | ||
| 11 | Mohamed Ali Aloulou, Christian Artigues: Worst-Case Evaluation of Flexible Solutions in Disjunctive Scheduling Problems. ICCSA (3) 2007: 1027-1036 | |
| 2006 | ||
| 10 | Christian Artigues, Michel Gendreau, Louis-Martin Rousseau: A Flexible Model and a Hybrid Exact Method for Integrated Employee Timetabling and Production Scheduling. PATAT 2006: 67-84 | |
| 9 | Christian Artigues, Pierre Lopez, Pierre-Dimitri Ayache: Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis CoRR abs/cs/0606043: (2006) | |
| 8 | Christian Artigues, Dominique Feillet, Philippe Michelon: Editorial. RAIRO - Operations Research 40(2): 75-76 (2006) | |
| 2005 | ||
| 7 | Christian Artigues, Pierre Lopez, Pierre-Dimitri Ayache: Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis. Annals OR 138(1): 21-52 (2005) | |
| 6 | Christian Artigues, Jean-Charles Billaut, Carl Esswein: Maximization of solution flexibility for robust shop scheduling. European Journal of Operational Research 165(2): 314-328 (2005) | |
| 5 | Sophie Demassey, Christian Artigues, Philippe Michelon: Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem. INFORMS Journal on Computing 17(1): 52-65 (2005) | |
| 2004 | ||
| 4 | Christian Artigues, Sana Belmokhtar, Dominique Feillet: A New Exact Solution Algorithm for the Job Shop Problem with Sequence-Dependent Setup Times. CPAIOR 2004: 37-49 | |
| 3 | Mireille Palpant, Christian Artigues, Philippe Michelon: LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search. Annals OR 131(1-4): 237-257 (2004) | |
| 2003 | ||
| 2 | Christian Artigues, Philippe Michelon, Stéphane Reusser: Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research 149(2): 249-267 (2003) | |
| 2000 | ||
| 1 | Christian Artigues, François Roubellat: A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. European Journal of Operational Research 127(2): 297-316 (2000) | |