 | 2011 |
| 18 |  | José Elias Claudio Arroyo,
André G. Santos,
Paula M. dos Santos,
Wellington G. Ribeiro:
A Bi-objective Iterated Local Search Heuristic with Path-Relinking for the p-Median Problem.
EMO 2011: 492-504 |
| 17 |  | Luís H. C. Bicalho,
André Gustavo dos Santos,
José Elias Claudio Arroyo:
Metaheuristic for parallel machines scheduling with resource-assignable sequence dependent setup times.
GECCO 2011: 449-456 |
| 16 |  | José Elias Claudio Arroyo,
Rafael dos Santos Ottoni,
Alcione de Paiva Oliveira:
Multi-objective Variable Neighborhood Search Algorithms for a Single Machine Scheduling Problem with Distinct due Windows.
Electr. Notes Theor. Comput. Sci. 281: 5-19 (2011) |
| 2010 |
| 15 |  | Edmar Hell Kamke,
José Elias Claudio Arroyo,
André Gustavo dos Santos:
Iterated Local Search with Path Relinking for Solving Parallel Machines Scheduling Problem with Resource-Assignable Sequence Dependent Setup Times.
EvoCOP 2010: 107-118 |
| 14 |  | José Elias Claudio Arroyo,
Michele dos Santos Soares,
Paula M. dos Santos:
A GRASP heuristic with Path-Relinking for a bi-objective p-median problem.
HIS 2010: 97-102 |
| 13 |  | José Elias Claudio Arroyo,
Paula M. dos Santos,
Michele S. Soares,
André Gustavo dos Santos:
A Multi-Objective Genetic Algorithm with Path Relinking for the p-Median Problem.
IBERAMIA 2010: 70-79 |
| 12 |  | André Gustavo dos Santos,
Rodolfo P. Araujo,
José Elias Claudio Arroyo:
A Combination of Evolutionary Algorithm, Mathematical Programming, and a New Local Search Procedure for the Just-In-Time Job-Shop Scheduling Problem.
LION 2010: 10-24 |
| 2009 |
| 11 |  | José Elias Claudio Arroyo,
Gilberto Vinicius P. Nunes,
Edmar Hell Kamke:
Iterative Local Search Heuristic for the Single Machine Scheduling Problem with Sequence Dependent Setup Times and Due Dates.
HIS (1) 2009: 505-510 |
| 10 |  | Rodolfo P. Araujo,
André Gustavo dos Santos,
José Elias Claudio Arroyo:
Genetic algorithm and local search for just-in-time job-shop scheduling.
IEEE Congress on Evolutionary Computation 2009: 955-961 |
| 9 |  | Edmar Hell Kamke,
José Elias Claudio Arroyo,
André Gustavo dos Santos:
Reactive GRASP with Path Relinking for Solving Parallel Machines Scheduling Problem with Resource-assignable Sequence Dependent Setup Times.
NaBIC 2009: 924-929 |
| 2008 |
| 8 |  | Mayron César O. Moreira,
José Elias Claudio Arroyo,
Tiago O. Januario,
Paulo L. Oliveira Júnior:
Genetic Algorithms for Bi-Objective Job Shop Scheduling Problem.
HIS 2008: 720-725 |
| 7 |  | José Elias Claudio Arroyo,
André Gustavo dos Santos,
Fabrício L. S. Silva,
Alexandre F. Araújo:
A GRASP with Path Relinking for the Single Machine Total Weighted Tardiness Problem.
HIS 2008: 726-731 |
| 6 |  | Tiago O. Januario,
José Elias Claudio Arroyo,
Mayron César O. Moreira:
Genetic Algorithm for Tardiness Minimization in Flowshop with Blocking.
NICSO 2008: 153-164 |
| 5 |  | José Elias Claudio Arroyo,
Pedro Sampaio Vieira,
Dalessandro Soares Vianna:
A GRASP algorithm for the multi-criteria minimum spanning tree problem.
Annals OR 159(1): 125-133 (2008) |
| 2005 |
| 4 |  | Dalessandro Soares Vianna,
José Elias Claudio Arroyo,
Pedro Sampaio Vieira,
Thiago Ribeiro de Azeredo:
Parallel strategies for a multi-criteria GRASP algorithm.
SCCC 2005: 116-122 |
| 3 |  | José Elias Claudio Arroyo,
Vinícius Amaral Armentano:
Genetic local search for multi-objective flowshop scheduling problems.
European Journal of Operational Research 167(3): 717-738 (2005) |
| 2004 |
| 2 |  | Dalessandro Soares Vianna,
José Elias Claudio Arroyo:
A GRASP Algorithm for the Multi-Objective Knapsack Problem.
SCCC 2004: 69-75 |
| 1 |  | Vinícius Amaral Armentano,
José Elias Claudio Arroyo:
An Application of a Multi-Objective Tabu Search Algorithm to a Bicriteria Flowshop Problem.
J. Heuristics 10(5): 463-481 (2004) |