![]() | ![]() |
| 2011 | ||
|---|---|---|
| 17 | Luís Henrique Sacchi, Vinícius Amaral Armentano: A computational study of parametric tabu search for 0-1 mixed integer programs. Computers & OR 38(2): 464-473 (2011) | |
| 16 | Vinícius Amaral Armentano, A. L. Shiguemoto, Arne Løkketangen: Tabu search with path relinking for an integrated production-distribution problem. Computers & OR 38(8): 1199-1209 (2011) | |
| 2009 | ||
| 15 | Rodrigo Moretti Branchini, Vinícius Amaral Armentano, Arne Løkketangen: Adaptive granular local search heuristic for a dynamic vehicle routing problem. Computers & OR 36(11): 2955-2968 (2009) | |
| 14 | Lars Magnus Hvattum, Kjetil Fagerholt, Vinícius Amaral Armentano: Tank allocation problems in maritime bulk shipping. Computers & OR 36(11): 3051-3060 (2009) | |
| 2007 | ||
| 13 | Vinícius Amaral Armentano, Moacir Felizardo de França Filho: Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach. European Journal of Operational Research 183(1): 100-114 (2007) | |
| 12 | Denise Sato Yamashita, Vinícius Amaral Armentano, Manuel Laguna: Robust optimization models for project scheduling with resource availability cost. J. Scheduling 10(1): 67-76 (2007) | |
| 2006 | ||
| 11 | Denise Sato Yamashita, Vinícius Amaral Armentano, Manuel Laguna: Scatter search for project scheduling with resource availability cost. European Journal of Operational Research 169(2): 623-637 (2006) | |
| 10 | Franklina Maria Bragion Toledo, Vinícius Amaral Armentano: A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines. European Journal of Operational Research 175(2): 1070-1083 (2006) | |
| 9 | Vinícius Amaral Armentano, Olinto César Bassi de Araujo: Grasp with memory-based mechanisms for minimizing total tardiness in single machine scheduling with setup times. J. Heuristics 12(6): 427-446 (2006) | |
| 2005 | ||
| 8 | José Elias Claudio Arroyo, Vinícius Amaral Armentano: Genetic local search for multi-objective flowshop scheduling problems. European Journal of Operational Research 167(3): 717-738 (2005) | |
| 2004 | ||
| 7 | Vinícius Amaral Armentano, José Elias Claudio Arroyo: An Application of a Multi-Objective Tabu Search Algorithm to a Bicriteria Flowshop Problem. J. Heuristics 10(5): 463-481 (2004) | |
| 2001 | ||
| 6 | Renata Mazzini, Vinícius Amaral Armentano: A heuristic for single machine scheduling with early and tardy costs. European Journal of Operational Research 128(1): 129-146 (2001) | |
| 1999 | ||
| 5 | Vinícius Amaral Armentano, Débora P. Ronconi: Tabu search for total tardiness minimization in flowshop scheduling problems. Computers & OR 26(3): 219-235 (1999) | |
| 1997 | ||
| 4 | Paulo M. França, Vinícius Amaral Armentano, Regina Berretta, Alistair Richard Clark: A heuristic method for lot-sizing in multi-stage systems. Computers & OR 24(9): 861-874 (1997) | |
| 1995 | ||
| 3 | Alistair Richard Clark, Vinícius Amaral Armentano: The application of valid inequalities to the multi-stage lot-sizing problem. Computers & OR 22(7): 669-680 (1995) | |
| 1994 | ||
| 2 | X.-B. Wu, Vinícius Amaral Armentano: Analytic Process of State and its Application in FMS Scheduling. Production Management Methods 1994: 271-278 | |
| 1992 | ||
| 1 | X.-B. Wu, Vinícius Amaral Armentano: Scheduling and Control of AGV Based Material Handling Systems. PROLAMAT 1992: 729-736 | |
Colors in the list of coauthors
Last update Sat May 26 04:23:17 2012 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page