![]() | ![]() |
| 2007 | ||
|---|---|---|
| 4 | Özlem Uzun Araz: Real-Time Controlled Multi-objective Scheduling Through ANNs and Fuzzy Inference Systems: The Case of DRC Manufacturing. International Conference on Computational Science (4) 2007: 973-976 | |
| 3 | Derya Eren Akyol, Özlem Uzun Araz: A Neural Network Based Decision Support System for Real-Time Scheduling of Flexible Manufacturing Systems. OR 2007: 83-88 | |
| 2006 | ||
| 2 | Özlem Uzun Araz, Özgür Eski, Ceyhun Araz: A Multi-Criteria Decision Making Procedure Based on Neural Networks for Kanban Allocation. ISNN (2) 2006: 898-905 | |
| 2005 | ||
| 1 | Özlem Uzun Araz: A Simulation Based Multi-criteria Scheduling Approach of Dual-Resource Constrained Manufacturing Systems with Neural Networks. Australian Conference on Artificial Intelligence 2005: 1047-1052 | |
| 1 | Derya Eren Akyol | [3] |
| 2 | Ceyhun Araz | [2] |
| 3 | Özgür Eski | [2] |
Data released under the ODC-BY 1.0 license — See also our legal information page