![]() | ![]() |
| 2011 | ||
|---|---|---|
| 29 | Zhaomin Ren, Chimay J. Anumba, J. Tah: RFID-facilitated construction materials management (RFID-CMM) - A case study of water-supply project. Advanced Engineering Informatics 25(2): 198-207 (2011) | |
| 28 | Aysu Sagun, Dino Bouchlaghem, Chimay J. Anumba: Computer simulations vs. building guidance to enhance evacuation performance of buildings during emergency events. Simulation Modelling Practice and Theory 19(3): 1007-1019 (2011) | |
| 2010 | ||
| 27 | Eleana Asimakopoulou, Chimay J. Anumba, Dino Bouchlaghem: A Grid-Aware Emergency Response Model (G-AERM) for Disaster Management. IJDST 1(3): 40-55 (2010) | |
| 2008 | ||
| 26 | Zhaomin Ren, Tarek M. Hassan, Chimay J. Anumba: The engineering services of a universal e-Engineering Hub: Application to the construction industry. Advances in Engineering Software 39(7): 545-557 (2008) | |
| 2007 | ||
| 25 | Konstantinos Domdouzis, Bimal Kumar, Chimay J. Anumba: Radio-Frequency Identification (RFID) applications: A brief introduction. Advanced Engineering Informatics 21(4): 350-355 (2007) | |
| 24 | Alastair Watson, Abdulla Kalian, Alistair Gibb, Chimay J. Anumba, Emeka Agbasi: Capturing a Scheme Design for Rainscreen Cladding. Comp.-Aided Civil and Infrastruct. Engineering 22(2): 149-161 (2007) | |
| 23 | Bishnu Prasad Das, Anne-Françoise Cutting-Decelle, Robert I. M. Young, Keith Case, Shahin Rahimifard, Chimay J. Anumba, N. M. Bouchlaghem: Towards the understanding of the requirements of a communication language to support process interoperation in cross-disciplinary supply chains. Int. J. Computer Integrated Manufacturing 20(4): 396-410 (2007) | |
| 2006 | ||
| 22 | Huiping Shang, Chimay J. Anumba, Dino Bouchlaghem: An Intelligent Risk Assessment System for AEC. CSCWD 2006: 963-968 | |
| 21 | Chimay J. Anumba, Zeeshan Aziz: Case Studies of Intelligent Context-Aware Services Delivery in AEC/FM. EG-ICE 2006: 23-31 | |
| 20 | Mark A. Shelbourn, Dino Bouchlaghem, Chimay J. Anumba, Patricia Carrillo: Developing a Decision-Making Framework for Effective Collaborative Working. ISPE CE 2006: 103-110 | |
| 19 | Ibrahim A. Motawa, Chimay J. Anumba, Ashraf El-Hamalawi: A fuzzy system for evaluating the risk of change in construction projects. Advances in Engineering Software 37(9): 583-591 (2006) | |
| 18 | Zhaomin Ren, Chimay J. Anumba, Tarek M. Hassan, Godfried Augenbroe, Mauro Mangini: Collaborative project planning: A case study of seismic risk analysis using an e-engineering hub. Computers in Industry 57(3): 218-230 (2006) | |
| 17 | Anne-Françoise Cutting-Decelle, Bishnu Prasad Das, Robert I. M. Young, Keith Case, Shahin Rahimifard, Chimay J. Anumba, N. M. Bouchlaghem: Building supply chain communication systems: a review of methods and techniques. Data Science Journal 5: 29-51 (2006) | |
| 2004 | ||
| 16 | M. Yeoh, P. Chung, Chimay J. Anumba, Ashraf El-Hamalawi, Ibrahim A. Motawa: Process change identification using workflow specification matching. AMCIS 2004: 506 | |
| 15 | Zhaomin Ren, Tarek M. Hassan, Chimay J. Anumba, Godfried Augenbroe, Mauro Mangini: Electronic Contracting in the E-Engineering Hub. Virtual Enterprises and Collaborative Networks 2004: 235-244 | |
| 14 | Andrew G. Kimmance, Chimay J. Anumba, Dino Bouchlaghem, Andrew N. Baldwin: The application of information modelling methodologies: the HIPPY approach to integrated project modelling. IJCAT 20(1-3): 62-77 (2004) | |
| 13 | Dino Bouchlaghem, Andrew G. Kimmance, Chimay J. Anumba: Integrating product and process information in the construction sector. Industrial Management and Data Systems 104(3): 218-233 (2004) | |
| 12 | Emeka Agbasi, Chimay J. Anumba, Alistair Gibb, Abdulla Kalian, Alastair Watson: Cladding sector road map for realising the CIM vision. Industrial Management and Data Systems 104(6): 526-532 (2004) | |
| 2003 | ||
| 11 | S. M. Beatham, M. A. P. Murray, Chimay J. Anumba, A. Thorpe, I. W. Hedges: Integration of design and construction - a review. ISPE CE 2003: 1157-1164 | |
| 10 | Anne-Françoise Cutting-Decelle, Robert I. M. Young, Chimay J. Anumba, Andrew N. Baldwin, N. M. Bouchlaghem: The Application of PSL to Product Design Across Construction and Manufacturing. Concurrent Engineering: R&A 11(1): 65-75 (2003) | |
| 2002 | ||
| 9 | Zhaomin Ren, Chimay J. Anumba: Learning in multi-agent systems: a case study of construction claims negotiation. Advanced Engineering Informatics 16(4): 265-275 (2002) | |
| 8 | Zhaomin Ren, Chimay J. Anumba, O. O. Ugwu: Negotiation in a Multi-Agent System for Construction Claims Negotiation. Applied Artificial Intelligence 16(5): 359-394 (2002) | |
| 7 | O. O. Ugwu, Chimay J. Anumba, J. M. Kamara, D. Leonard: Electronic procurement of construction products. IJSTM 3(2): 222-237 (2002) | |
| 6 | Chimay J. Anumba, Catherine Baugh, Malik M. A. Khalfan: Organisational structures to support concurrent engineering in construction. Industrial Management and Data Systems 102(5): 260-270 (2002) | |
| 2001 | ||
| 5 | A. Ganah, Chimay J. Anumba, N. M. Bouchlaghem: Computer Visualisation as a Communication Tool in the Construction Industry. IV 2001: 679- | |
| 2000 | ||
| 4 | Chimay J. Anumba, Alistair K. Duke: Telepresence in concurrent lifecycle design and construction. AI in Engineering 14(3): 221-232 (2000) | |
| 3 | Feniosky Peña-Mora, Chimay J. Anumba, J. Solari, Alistair Duke: An Integrated Telepresence Environment for Collaboration in Construction. Eng. Comput. (Lond.) 16(3-4): 287-305 (2000) | |
| 2 | Chimay J. Anumba, N. M. Bouchlaghem, Jennifer Whyte, Alistair Duke: Perspectives on an Integrated Construction Project Model. Int. J. Cooperative Inf. Syst. 9(3): 283-313 (2000) | |
| 1997 | ||
| 1 | Chimay J. Anumba, Alistair Duke: Internet and Intranet Usage in a Communications Infrastructure for Virtual Construction Project Teams. WETICE 1997: 56-61 | |
Colors in the list of coauthors
Last update Tue Feb 14 23:09:10 2012 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page