 | 2012 |
| 27 |  | Talel Ladhari,
Mohamed Kais Msakni,
Ali Allahverdi:
Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times.
JORS 63(4): 445-459 (2012) |
| 2010 |
| 26 |  | Harun Aydilek,
Ali Allahverdi:
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time.
Computers & Mathematics with Applications 59(2): 684-693 (2010) |
| 25 |  | Ali Allahverdi,
Harun Aydilek:
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times.
Computers & Mathematics with Applications 60(5): 1374-1384 (2010) |
| 24 |  | Fawaz S. Al-Anzi,
Khaled Al-Zame,
Ali Allahverdi:
Weighted Multi-Skill Resources Project Scheduling.
JSEA 3(12): 1125-1130 (2010) |
| 2009 |
| 23 |  | Ali Allahverdi,
Fawaz S. Al-Anzi:
The two-stage assembly scheduling problem to minimize total completion time with setup times.
Computers & OR 36(10): 2740-2747 (2009) |
| 22 |  | Rubén Ruiz,
Ali Allahverdi:
Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness.
Computers & OR 36(4): 1268-1283 (2009) |
| 21 |  | Fawaz S. Al-Anzi,
Ali Allahverdi:
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan.
Computers & OR 36(9): 2682-2689 (2009) |
| 2008 |
| 20 |  | Ali Allahverdi,
H. M. Soroush:
The significance of reducing setup times/setup costs.
European Journal of Operational Research 187(3): 978-984 (2008) |
| 19 |  | Ali Allahverdi,
C. T. Ng,
T. C. Edwin Cheng,
Mikhail Y. Kovalyov:
A survey of scheduling problems with setup times or costs.
European Journal of Operational Research 187(3): 985-1032 (2008) |
| 2007 |
| 18 |  | Rubén Ruiz,
Ali Allahverdi:
Some effective heuristics for no-wait flowshops with setup times to minimize total completion time.
Annals OR 156(1): 143-171 (2007) |
| 17 |  | Fawaz S. Al-Anzi,
Ali Allahverdi:
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times.
European Journal of Operational Research 182(1): 80-94 (2007) |
| 16 |  | Fawaz S. Al-Anzi,
Ali Allahverdi,
Mikhail Y. Kovalyov:
Batching deteriorating items with applications in computer communication and reverse logistics.
European Journal of Operational Research 182(3): 1002-1011 (2007) |
| 2006 |
| 15 |  | Fawaz S. Al-Anzi,
Yuri N. Sotskov,
Ali Allahverdi,
George V. Andreev:
Using mixed graph coloring to minimize total completion time in job shop scheduling.
Applied Mathematics and Computation 182(2): 1137-1148 (2006) |
| 14 |  | Ali Allahverdi,
Fawaz S. Al-Anzi:
A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application.
Computers & OR 33: 1056-1080 (2006) |
| 13 |  | Ali Allahverdi,
Fawaz S. Al-Anzi:
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times.
European Journal of Operational Research 169(3): 767-780 (2006) |
| 2005 |
| 12 |  | Fawaz S. Al-Anzi,
Ali Allahverdi:
Using a Hybrid Evolutionary Algorithm to Minimize Variance in Response Time for Multimedia Object Requests.
J. Math. Model. Algorithms 4(4): 435-453 (2005) |
| 2004 |
| 11 |  | Ali Allahverdi:
A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness.
Computers & OR 31(2): 157-180 (2004) |
| 10 |  | Ali Allahverdi,
Tariq A. Aldowaisan:
No-wait flowshops with bicriteria of makespan and maximum lateness.
European Journal of Operational Research 152(1): 132-147 (2004) |
| 2003 |
| 9 |  | Ali Allahverdi,
Fawaz S. Al-Anzi:
Scheduling Requests on Multi-Stage Multi-Server to Increase Quality of Service.
Net-Con 2003: 14-25 |
| 8 |  | Tariq A. Aldowaisan,
Ali Allahverdi:
New heuristics for no-wait flowshops to minimize makespan.
Computers & OR 30(8): 1219-1231 (2003) |
| 7 |  | Ali Allahverdi:
The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime.
European Journal of Operational Research 147(2): 373-396 (2003) |
| 2002 |
| 6 |  | Ali Allahverdi,
Fawaz S. Al-Anzi:
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications.
Computers & OR 29(8): 971-994 (2002) |
| 2000 |
| 5 |  | Ali Allahverdi:
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times.
Computers & OR 27(2): 111-127 (2000) |
| 1999 |
| 4 |  | Ali Allahverdi:
Stochastically minimizing total flowtime in flowshops with no waiting space.
European Journal of Operational Research 113(1): 101-112 (1999) |
| 1998 |
| 3 |  | Tariq A. Aldowaisan,
Ali Allahverdi:
Total flowtime in no-wait flowshops with separated setup times.
Computers & OR 25(9): 757-765 (1998) |
| 1997 |
| 2 |  | Ali Allahverdi:
Scheduling in stochastic flowshops with independent setup, processing and removal times.
Computers & OR 24(10): 955-960 (1997) |
| 1996 |
| 1 |  | Ali Allahverdi:
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness.
Computers & OR 23(10): 909-916 (1996) |