 | 2012 |
| 27 |  | Alessandro Agnetis,
Enrico Grande,
Andrea Pacifici:
Demand allocation with latency cost functions.
Math. Program. 132(1-2): 277-294 (2012) |
| 2011 |
| 26 |  | Alessandro Agnetis,
Gabriella Dellino,
Paolo Detti,
Giacomo Innocenti,
Gianluca de Pascale,
Antonio Vicino:
Appliance operation scheduling for electricity consumption optimization.
CDC-ECE 2011: 5899-5904 |
| 25 |  | Alessandro Agnetis,
Paolo Detti,
Patrick Martineau:
Scheduling problems with unreliable jobs and machines.
CTW 2011: 32-35 |
| 24 |  | Alessandro Agnetis,
Marta Flamini,
Gaia Nicosia,
Andrea Pacifici:
A job-shop problem with one additional resource type.
J. Scheduling 14(3): 225-237 (2011) |
| 2010 |
| 23 |  | Alessandro Agnetis,
Marta Flamini,
Gaia Nicosia,
Andrea Pacifici:
Scheduling three chains on two parallel machines.
European Journal of Operational Research 202(3): 669-674 (2010) |
| 2009 |
| 22 |  | Alessandro Agnetis,
Enrico Grande,
Pitu B. Mirchandani,
Andrea Pacifici:
Covering a line segment with variable radius discs.
Computers & OR 36(5): 1423-1436 (2009) |
| 21 |  | Alessandro Agnetis,
Arianna Alfieri,
Gaia Nicosia:
Single-Machine Scheduling Problems with Generalized Preemption.
INFORMS Journal on Computing 21(1): 1-12 (2009) |
| 20 |  | Alessandro Agnetis,
Paolo Detti,
Marco Pranzo,
Manbir S. Sodhi:
Sequencing unreliable jobs on parallel machines.
J. Scheduling 12(1): 45-54 (2009) |
| 19 |  | Alessandro Agnetis,
Gianluca de Pascale,
Dario Pacciarelli:
A Lagrangian approach to single-machine scheduling problems with two competing agents.
J. Scheduling 12(4): 401-415 (2009) |
| 18 |  | Paolo Detti,
Cor A. J. Hurkens,
Alessandro Agnetis,
Gianfranco Ciaschetti:
Optimal packet-to-slot assignment in mobile telecommunications.
Oper. Res. Lett. 37(4): 261-264 (2009) |
| 2008 |
| 17 |  | Alessandro Agnetis,
Enrico Grande,
Andrea Pacifici:
Demand allocation with latency cost functions
CoRR abs/0810.1650: (2008) |
| 2007 |
| 16 |  | Alessandro Agnetis,
Dario Pacciarelli,
Andrea Pacifici:
Multi-agent single machine scheduling.
Annals OR 150(1): 3-15 (2007) |
| 15 |  | Alessandro Agnetis,
Enrico Grande,
Pitu B. Mirchandani,
Andrea Pacifici:
Covering a line segment with variable radius discs
CoRR abs/0707.2921: (2007) |
| 2006 |
| 14 |  | Alessandro Agnetis,
Nicholas G. Hall,
Dario Pacciarelli:
Supply chain scheduling: Sequence coordination.
Discrete Applied Mathematics 154(15): 2044-2063 (2006) |
| 2005 |
| 13 |  | Paolo Detti,
Alessandro Agnetis,
Gianfranco Ciaschetti:
Polynomial Algorithms for a Two-Class Multiprocessor Scheduling Problem in Mobile Telecommunications Systems.
J. Scheduling 8(3): 255-273 (2005) |
| 12 |  | Carlo Filippi,
Alessandro Agnetis:
An asymptotically exact algorithm for the high-multiplicity bin packing problem.
Math. Program. 104(1): 21-37 (2005) |
| 2004 |
| 11 |  | Alessandro Agnetis,
Fabrizio Rossi,
Stefano Smriglio:
An implicit enumeration scheme for the batch selection problem.
Networks 44(2): 151-159 (2004) |
| 10 |  | Alessandro Agnetis,
Pitu B. Mirchandani,
Dario Pacciarelli,
Andrea Pacifici:
Scheduling Problems with Two Competing Agents.
Operations Research 52(2): 229-242 (2004) |
| 2003 |
| 9 |  | Alessandro Agnetis,
Paolo Detti,
Carlo Meloni:
Process selection and sequencing in a two-agents production system.
4OR 1(2): 103-119 (2003) |
| 8 |  | Alessandro Agnetis,
Arianna Alfieri,
Gaia Nicosia:
Part Batching and Scheduling in a Flexible Cell to Minimize Setup Costs.
J. Scheduling 6(1): 87-108 (2003) |
| 2001 |
| 7 |  | Alessandro Agnetis,
Paolo Detti,
Carlo Meloni,
Dario Pacciarelli:
Set-Up Coordination between Two Stages of a Supply Chain.
Annals OR 107(1-4): 15-32 (2001) |
| 6 |  | Alessandro Agnetis,
Paolo Detti,
Carlo Meloni,
Dario Pacciarelli:
A linear algorithm for the Hamiltonian completion number of the line graph of a tree.
Inf. Process. Lett. 79(1): 17-24 (2001) |
| 2000 |
| 5 |  | Alessandro Agnetis,
Pitu B. Mirchandani,
Dario Pacciarelli,
Andrea Pacifici:
Nondominated Schedules for a Job-Shop with Two Competing Users.
Computational & Mathematical Organization Theory 6(2): 191-217 (2000) |
| 4 |  | Alessandro Agnetis:
Scheduling no-wait robotic cells with two and three machines.
European Journal of Operational Research 123(2): 303-314 (2000) |
| 3 |  | Alessandro Agnetis,
Dario Pacciarelli:
Part sequencing in three-machine no-wait robotic cells.
Oper. Res. Lett. 27(4): 185-192 (2000) |
| 1997 |
| 2 |  | Alessandro Agnetis,
Dario Pacciarelli,
Fabrizio Rossi:
Batch Scheduling in a Two-machine Flow Shop with Limited Buffer.
Discrete Applied Mathematics 72(3): 243-260 (1997) |
| 1990 |
| 1 |  | Alessandro Agnetis,
F. Nicolo,
Mario Lucertini:
Flexibility/Cost Tradeoff in the Design of Production Systems: a Preliminary Approach.
Modelling the Innovation 1990: 247-258 |