![]() | ![]() |
| 2010 | ||
|---|---|---|
| 6 | Cemalettin Öztürk, Arslan M. Örnek: Capacitated lot sizing with linked lots for general product structures in job shops. Computers & Industrial Engineering 58(1): 151-164 (2010) | |
| 5 | Cemalettin Öztürk, Semra Tunali, Brahim Hnich, Arslan M. Örnek: Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times. Electronic Notes in Discrete Mathematics 36: 65-72 (2010) | |
| 4 | Arslan M. Örnek, Selin Özpeynirci, Cemalettin Öztürk: A note on "A mixed integer programming model for advanced planning and scheduling (APS)". European Journal of Operational Research 203(3): 784-785 (2010) | |
| 2009 | ||
| 3 | Kamil Erkan Kabak, Arslan M. Örnek: An improved metric for measuring multi-item multi-level schedule instability under rolling schedules. Computers & Industrial Engineering 56(2): 691-707 (2009) | |
| 2008 | ||
| 2 | Banu Yetkin Ekren, Arslan M. Örnek: A simulation based experimental design to analyze factors affecting production flow time. Simulation Modelling Practice and Theory 16(3): 278-293 (2008) | |
| 2007 | ||
| 1 | Esra Ekinci, Arslan M. Örnek: A Heuristic Approach for Determining Lot Sizes and Schedules Using Power-of-Two Policy. JAMDS 2007: (2007) | |
| 1 | Esra Ekinci | [1] |
| 2 | Banu Yetkin Ekren | [2] |
| 3 | Brahim Hnich | [5] |
| 4 | Kamil Erkan Kabak | [3] |
| 5 | Selin Özpeynirci (Selin Bilgin Özpeynirci) | [4] |
| 6 | Cemalettin Öztürk | [4] [5] [6] |
| 7 | Semra Tunali | [5] |
Colors in the list of coauthors
Last update Sat May 26 04:23:17 2012 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page